FPU cuts the ribbon on EV charging stations – Seven States Power Corporation (2024)

Home / FPU cuts the ribbon on EV charging stations

FPU cuts the ribbon on EV charging stations – Seven States Power Corporation (1)

Fayetteville, TN – It was a time of celebration Wednesday morning as Fayetteville Public Utilities (FPU) officially cut the ribbon on its electric vehicle (EV) charging stations. Representatives from FPU, the Tennessee Valley Authority (TVA) and Seven States Power Corporation along with state and local officials gathered at 110 College Street West in downtown Fayetteville to celebrate the installation of 2 EV fast chargers.

FPU CEO/General Manager Britt Dye welcomed guests to the ribbon cutting to officially open the EV charging stations and to celebrate the utility’s entry into the Fast Charge Tennessee Network. As part of the network, the Fayetteville chargers will appear on maps EV drivers use to find nearby charging stations.

FPU partnered with TVA and TDEC as well as Seven States Power Corporation to install these charging stations and help ensure that Fayetteville is ready for the growth of electric transportation with public, fast charging infrastructure. Grant funding from TVA and TDEC made the charging stations possible with FPU contributing to the project as well.

When addressing the audience, FPU Chairman of the Board Russ Dixon commented, “I would like to thank TDEC and TVA for their partnership and vision in helping make the Fast Charge Network possible. I would also like to recognize the City of Fayetteville for their collaboration with FPU to secure this site and make this charging station a reality. I am proud of FPU for making this exciting addition to our city possible. Connecting Fayetteville to the Fast Charge Network is just one example of how the FPU team continues to keep our community at the forefront of innovation.”

“EVs are going to be around for a long time,” said Tennessee Speaker of the House Pro Tempore and Tennessee State Representative Pat Marsh. “I’m proud to see FPU, TDEC and TVA partner to do this in Fayetteville next to the square in such a wonderful location.”

Tennessee State Representative Clay Doggett remarked, “Owners of EVs plan their routes by where they can find places to charge. With this being on the map, it will be an exciting time for visitors that are coming into our communities. I guarantee that someone will enjoy a slaw burger for the first time because of this charging station. Congratulations to all involved who helped put this together.”

Seven States Power Corporation Director of Technology Alignment B.J. Bernard expressed his appreciation to those gathered, “Seven States is honored to be a part of this project with Fayetteville Public Utilities. We are excited about the TVA Fast Charge Network and congratulate FPU and local leaders who have helped support this project. This network is being deployed all over the Valley. There is a lot of work that goes into one of these projects . Thank you to the FPU team for your work here. This is a great looking site, and I commend you on that.”

According to TVA Community Relations Manager Chris Smith, “The Fast Charge Network will place public fast chargers like these at least every fifty miles across interstates and major highways in TVA’s 7 state area over the next 5 years. EVs will help move our local and regional economies forward in so many ways. This fast-charging site will serve local drivers and bring travelers into town to enjoy the amenities of Fayetteville while they refuel. EV chargers keep refueling dollars in our communities through local power companies like FPU. With projects like this one today, we are continuing in the spirit of innovation and our mission of service. Congratulations on this site.”

The station, capable of charging two vehicles at one time, is conveniently located in the public parking area near the square on College Street West. Designated EV-charging parking spaces denote the station and are clearly marked with signage.

“This new fast charging site does more than charge cars,” Dye commented. “It connects Fayetteville to the regional Fast Charge Network and plays an important role in preparing our region for the environmental and economic benefits of electric transportation. The public chargers will be utilized by those traveling through Fayetteville and will draw motorists to visit downtown shops and restaurants while their vehicles charge. It will create opportunities for local tourism as EV owners plan their roads trips to visit new destinations and enjoy towns they might not visit otherwise. These stations represent another way FPU works to serve our community.”

To learn more about the Fast Charge Network or locate EV charging stations on your travel route, visit https://energyright.com/ev/.

FPU cuts the ribbon on EV charging stations – Seven States Power Corporation (2024)

References

Top Articles
Latest Posts
Article information

Author: Kelle Weber

Last Updated:

Views: 6050

Rating: 4.2 / 5 (53 voted)

Reviews: 84% of readers found this page helpful

Author information

Name: Kelle Weber

Birthday: 2000-08-05

Address: 6796 Juan Square, Markfort, MN 58988

Phone: +8215934114615

Job: Hospitality Director

Hobby: tabletop games, Foreign language learning, Leather crafting, Horseback riding, Swimming, Knapping, Handball

Introduction: My name is Kelle Weber, I am a magnificent, enchanting, fair, joyous, light, determined, joyous person who loves writing and wants to share my knowledge and understanding with you.